This lenghty document is an exacting mission-by-mission pass schedule for Wing Commander Prophecy -- when each one must be completed and ready for the various milestones (Alpha, Beta, E3, ECTS, etc.) I would say that the fan projects could learn from this -- but they seem to have a pretty professional testing system already in place! Also note the fact that the various multiplayer points are 'not started'.

These updates are thanks to John "Captain Johnny" Guentzel, who provided several CD image archives of material used by the Wing Commander Prophecy development team!

MTG2_Design_Schedulet.jpg


Design Schedule
Download (40 kb)

Date: September 15, 1997
Project: Wing Commander Prophecy
Donated By: John Guentzel
Pages: 19


--
Original update published on February 18, 2009
 
Last edited by a moderator:
Yikes, they didn't have long before Beta to get through all of those missions. I imagine they still had a long to debug with only pass three through the missions started.
 