Well, I'm just on the third Gameplay video now. Im having a hectic week and haven't had a lot of time, but I'm progressing. Although I won't be including every mission, I can say that I am less than half done the gameplay videos. Then I need to make sure they work into the complete project nicely. Although I'm mostly done the editing on the games FMV sequences I'm sure it will need a little reworking once the gameplay videos are in place.
So as far as time schedule goes, I hope it wont be too long. It depends on how much I decide to change the scope of the project too, though.... For example re-introducing the 5.1 audio, in which case I will need to rework
every scene. Most likelt the internet version will only be 2.0 and when I complete my source DVD I would like to include the 5.1. With a little help, I'm trying to work on a technical solution to that problem.
As I mentioned, It also depends on my free time, as most of this is getting done between 11pm and 2am But progress will be faster if I get a few days off work or If my 2 year old is napping at a convenient time. As much as I'd love to concentrate totally on this project, I won't do so at the expense of my family.
Thanks for the interest in this project. I'll try and keep everyone posted as to the progress.